![DSC02858](http://www.alfredfachexcavating.ca/wp-content/uploads/2016/07/DSC02858.jpg)
The Details
Requirements for project:
This project involved the following:
- Temporary creek bypass while installing box culverts for future road
- Water main installation
- Sanitary Main Sewer installation
- Storm sewer installation
Location: Future Kitchener Honda