![20160511_161430](https://www.alfredfachexcavating.ca/wp-content/uploads/2016/07/20160511_161430-e1468845541106.jpg)
The Details
Challenge
The requirements of this project was to update infrastructure underneath a Lincoln Road in Waterloo, Ontario.
Solution
This project involved the supplying and installation 600 metres of 200mm sanitary main to depth of 5 metres down heavily used road in heart of Waterloo, Ontario.